Paul Basler has responded to our questions about the road resurfacing job. The full letter is reproduced on the "Projects" page. Briefly:
- The driveway aprons will be seal-coated, notice will be sent.
- The color of the road should darken over time to better match the sidewalks.
- The white line will be repainted, probably in September.
No comments:
Post a Comment